The Grit Guard Insert Red, Black, Yellow, Blue, Silver

Protect your paint from swirls caused by contaminated car wash water with the Grit Guard Insert.

Most paint swirls are caused by improper detailing techniques. For example, when you wash your vehicle, dirt and sand get trapped in the sponge or mitt. The first time you re-wet your sponge in the bucket, some of the abrasive particles will come off the sponge into the water. Subsequent dips in the bucket will re-contaminate your sponge. These contaminants will then rub against your paint and produce swirls. You know what they say about good intentions…

To get those particles out of your sponge or mitt, you need the Grit Guard Insert. The raised radial surface fits in the bottom of any 5 gallon bucket and extracts grit from your wash mitt or sponge when you drag it across the Grit Guard Insert. The dirt settles at the bottom of the bucket so your car wash water stays clean. The Grit Guard Insert has a radial grid surface that scrapes dirt out of your mitt or sponge. Four quadrants at the base of the Grit Guard Insert calm the wash water and hold the grid above the bottom of the bucket. Dirt falls to the bottom and stays there. You’ll be amazed at how much dirt accumulates in the bottom of your wash bucket!

The Grit Guard Insert is a real paint-saver. But it has a number of other uses, too. Use it to clean paint brushes by running the bristles across the grid in a bucket of water or paint thinner. Clean automotive parts or drain your oil filter. You can even use the four quadrants as a grid when laying tile.

The Grit Guard Insert is solvent resistant and durable. It stands 2 ½” off the bottom of the bucket and measures 10 1/8” diameter, perfect for any 12” diameter bucket. It is available in bright array of colors. The Grit Guard is American-made and patent-pending.

The Grit Guard Insert takes the grit out of your mitt for safer, swirl-free washing. This inexpensive item can save you countless hours and dollars spent removing swirls.

Two Grit Guard Inserts are better than one! For optimum paint protection, stack two Grit Guards in one bucket. The stacked grids stand 5 inches above the bottom of the bucket and stabilize more water. The grit settles to the bottom of the bucket and remains there because the grids prevent the water from being stirred up in the bottom. The addition of a second Grit Guard Insert also provides more clearance between the clean water at the top and the dirty water at the bottom to lessen the likelihood that a stray grain of sand will find its way to the top.

Warm Traditions Family Room Remodel

Looking for an engagement party venues Melbourne to hire? Make sure you have the exact number of guests lists.

In the Family Room we designed a plan that took out our clients old fireplace and large unframed mirror and gave them a nice larger double tiered fireplace complete with an onyx stone surround. We went with a classic white mantle to offset the gorgeous but possibly overpowering onyx, and I think it was a great pairing. The new quarter sawn oak wood flooring in a gorgeous medium toned finish runs right up to the onxy hearth and was a complete opposite of the old carpet and tile they had. We also tore out the old medium oak railing and replaced it with a larger classically designed dark stained oak newel post with painted white balusters. The dark oak newel post and handrail help define the stair rail and add visual interest. Not to mention the two tone look of the dark railing framing the white balusters will allow us to go with either dark or light cabinets when we complete the kitchen remodel down the road.

As for the furniture we replaced the old worn out blue leather sofas with a medium toned brown tufted leather sofa set with custom cushions. As this family room that you see from the front door also serves the purpose of the main tv gathering for the family it had to function as such but also look it’s best. One of the few seating arrangement options was to have a sofa and a loveseat in order to fit the whole family and still be able to view the TV. Often times in a smaller room this will create a problem because you will have two large sofas that are the same color and they seem redundant and blah, plus we weren’t even able to break up the blahness by a sofa table because there wasn’t enough room. We fixed this dilemma by selecting a medium brown leather that had multiple tones throughout it, so even though it was one color of leather there is some visual interest. On top of that we removed the new leather sofa cushion shells and stored them away for safe keeping (those might come in handy one day with grandkids!) and had them reupholstered in a gorgeous green paisley with accents of gold to warm it all up. Add on the custom pillows with a knubby tweed and a stripe with fringe and you have a gorgeous sofa set that is not only appealing visually, but sturdy and functional to hold up with a family of boys!

Some of the “to do’s” we put on our list at the start of this project was to design a solution for more controlled lighting and to fix the interesting wall that separated the family room from the living room. As for lighting we installed some recessed lights, a new decorative ceiling fan, and an entry chandelier all which were installed with dimmer switches. As for the wall, the two rooms are connected by a large vault, but the wall that separated them only went up about 8 feet and then there was shelf space. On top of just being odd looking with a post going through it, the function of the family room suffered due to the fact that sounds would echo as they were watching TV or listening to music. So we designed a plan that took the wall all the way up and preserved most of the shelving space so that we could add visual interest by displaying accessories up top. Plus, on the living room side of the wall we were able to add some fun trim to the wall to give it a great look like it was always supposed to be that way (living room pictures coming soon!) So with the wall in place we were able to install some rope lighting up top to highlight those fun accessories we added. Then we took down the outdated family photos (new ones will be displayed down the hallway “gallery”) and replaced them with a fun clock and a large relaxing picture that just beckons you to walk into it!

Outsource The Specifics of Your Next Event

Trying to add working out the details of a special event to your full schedule can be almost impossible. Rather than enjoying the process, you will be stressed every step of the way. You can avoid such hassles but still have a remarkable event when you outsource the planning. Behind the scenes, the event management company you hired can take care of it all! Ricepaperscissors.com.au is the easy way to find a venue for your 21st birthday venues Melbourne.

You will still be involved, and you will work closely with them. You will share information about what you want, answer their questions, and make final decisions. Yet you will know everything is falling into place. It won’t consume your time and make you struggle to find a balance with everything on your plate!

It doesn’t make sense to take it on when you can outsource. If you spread yourself too thin, you will struggle to make anything work out the way you need it to. When you can prioritise and then outsource items such as events, it will all get done with positive results.

The Right Provider

The outcome you will gain with all of this though depends on the event management provider you hire. You need to do your homework and be selective, so you can move forward with confidence. You don’t have the time or energy to micro manage them. You need to share information and feel assured they can take the lead and run with it!

Spend time identifying the possible event management options in your area. Next, find out about their overall reputation. Eliminate any of them that seem to have a list of complaints against them. You want the outcome of your event to be spectacular, so hire someone who does pay attention to the details and get them right. Find a provider that is both patient and efficient.

Make them a Priority

Communication is essential to make event management work for your needs. Always make them a priority because the delays you create when you don’ t get back to them timely can have an effect on the outcome. They need you to make them a priority, so they can continue to move everything forward. Schedule times to discuss plans and to see about the ongoing progress.

However, there may be some last-minute details or changes they need to discuss with you out of the blue. Make sure they know how to reach out to you via email or phone, so the event management can always share information with you. Don’t be a barrier they have to deal with in the planning, be an ally they can work with.

Cost

It doesn’t have to be a huge expense to hire a wonderful event management company either. The cost will vary depending on what you need them to do, how soon you need it done, and their pricing. They should be able to give you a price quote for the services once they have consulted with you and discussed the parameters of your needs.

Since most of these providers have great relationships with other entities such as catering services and bands, they can get some great discounts. This also helps them to make money with their services but also give you a great price for what the event will entail. If you often host events, going this route can help you to feel better about them in the future.

You can forge a long-term relationship with the provider, so they can continue to help you make each event wonderful. If you only need them occasionally for annual events, that is fine too. The sooner you find a great company to work with, the faster you will feel that weight lifted from your own shoulders. Then you can focus your attention on other issues that also need your input.

Anaerobic digestion: How we get energy from waste

A Waste Administration system which appropriates for refining blended (black bag) waste has actually been established from innovation initial established in Israel. Unused equipments in office should be cleaned up by office rubbish removal Sydney to maintain cleanliness in your working area.

It recoups resources from waste while producing renewable energy and also assisting to lower carbon exhausts. In other words it releases energy from our rubbish, and also minimizes the amount of rubbish which could or else be sent to landfill, while at the same time lowering environment modification.

This is really a win-win situation!

The ArrowBio process has been created through a collection of pilot and demo plants to a level ready to be used commercially in many countries, and is best described as a water-based mechanical biological treatment (MBT) facility with energy recovery.

ArrowBio’s process has been created as if it can either be utilized as a stand-alone option or in conjunction with other modern technologies. For example it can be sited within sustainable energy parks to provide a source of power in addition to recycled products for further handling. The recycled products are re-used as feedstock by the other organisations based within the park to develop a selection of products.

Two Stage Anaerobic Digestor

ArrowBio sets out to fully recuperate as well as wash the recyclable elements of the waste, so it must be favoured by ecological teams which tend to challenge alternative processes which handle mixed waste, like incineration, on the basis that the capability of incineration to handle combined wastes decreases the requirement to separate as well as recycle. The argument is that incineration makes it also easy to forget recycling, so it must not be utilized.

The process contends its core a 2 stage anaerobic digestor which has been optimized for much better energy yield than completing systems, from every system mass of raw material processed.

Removing the optimum available gas yield, remains in fact a specified main objective of the ArrowBio processs.

This is acknowledged as excellent policy eco, and also of course the gas as well as, or electrical power generates revenue, which helps to spend for the upkeep of the plant.

The process consists of 2 unique yet integrated elements: a “front-end ” damp Materials Healing Center (MRF) and also a “back-end ” progressed anaerobic food digestion system.

The damp MRF incorporates conventional solid waste handling innovation in mix with fluid as well as slurry pumping, water based handling assists in, easy separation, and also cleansing of recyclables as well as their automated conveyance around the center, while likewise subduing odours and also dust.

In the wet MRF, the activity of the water cleanses, and recuperates, ferrous steels, non-ferrous steels as well as plastics divided by kind. These are after that arranged into recycled products of different grades that can be offered directly into the reusing market.

A “hydrocrusher ” has also been effectively established by ArrowBio which forms part of the wet (anaerobic) process. In effect the eco-friendly waste is jetted with high pressure jets of water through a series of pipes. Food and also paper is torn apart, greatly boosting the surface area available to organic activity, while concurrently putting on hold the natural chemicals in a watery option.

Any waste that is not recoverable or that is not sent through the anaerobic digesters leaves from the ArrowBio facility as a residue, and also is normally present in only in small quantities.

The initial part of ArrowBio’s anaerobic food digestion procedure is referred to as the acidogenic phase, and also the 2nd is a methanogenic phase. The biomass accomplishes maximum effectiveness compared to solitary tank AD, as well as optimization of pH levels, temperature and residence times is achieved instantly.

The plant has low discharges. The ArrowBio style needs no expensive gas rubbing phase, and the mostly water birthed strategy does not generate the frustrating (dirt, smell, etc) exhausts experienced from some other processes.

Recognition of the sustainability advantages of Anaerobic Digestion in releasing energy from our garbage is rising fast.

Find out more about this innovation for the future, at the Anaerobic Digestion Community internet site, as well as much more regarding the ArrowBio AD Process also.

Anaerobic Food Digestion Makes Renewable Resource From Waste

A Waste Management system which is suitable for refining blended (black bag) waste has been established from modern technology initial established in Israel. Green waste disposal service compost the green wastes.

It recuperates resources from waste while producing renewable resource and aiding to decrease carbon discharges. Simply puts it launches power from our rubbish, and minimizes the amount of rubbish which could or else be sent to land fill, while at the same time lowering environment modification.

This is really a great deal!

The ArrowBio procedure has been developed through a collection of pilot and also demo plants to a level prepared to be utilized commercially in several nations, and also is best described as a water-based mechanical organic treatment (MBT) center with power recuperation.

ArrowBio’s procedure has been established as if it can either be utilized as a option or together with other innovations. As an example it can be sited within lasting power parks to offer a source of power in addition to recycled products for further handling. The recycled products are re-used as feedstock by the various other organisations based within the park to create a variety of products.

Two Phase Anaerobic Digestor

ArrowBio sets out to totally recuperate and also wash the recyclable aspects of the waste, so it needs to be favoured by ecological groups which have the tendency to object to alternate processes which handle combined waste, like incineration, on the basis that the capacity of incineration to manage blended wastes minimizes the necessity to separate and also reuse. The argument is that incineration makes it as well simple to overlook recycling, so it must not be used.

The process contends its core a two stage anaerobic digestor which has been maximized for far better power return than completing systems, from every unit mass of raw material processed.

Drawing out the maximum readily available gas yield, remains in fact a mentioned key goal of the ArrowBio processs.

This is identified as great plan environmentally, and certainly the gas and also, or electrical power produces income, which assists to spend for the maintenance of the plant.

The process includes two distinct yet integrated parts: a “front-end ” damp Products Recovery Center (MRF) and also a “back-end ” progressed anaerobic digestion system.

The damp MRF combines standard solid waste taking care of innovation in mix with fluid and also slurry pumping, water based processing assists in, easy separation, and cleansing of recyclables and also their automated conveyance around the facility, while likewise reducing smells as well as dirt.

In the wet MRF, the action of the water cleans up, and recuperates, ferrous steels, non-ferrous metals and also plastics divided by type. These are then arranged into recycled products of different qualities that can be sold directly into the recycling market.

A “hydrocrusher ” has also been effectively developed by ArrowBio which develops part of the damp (anaerobic) procedure. Essentially the naturally degradable waste is jetted with high pressure jets of water through a collection of pipelines. Food as well as paper is torn apart, considerably raising the surface area available to organic activity, while at the same time putting on hold the natural chemicals in a watery option.

Any kind of waste that is not recoverable or that is not sent with the anaerobic digesters leaves from the ArrowBio facility as a deposit, and is usually present in just in small amounts.

The first part of ArrowBio’s anaerobic digestion process is referred to as the acidogenic phase, and also the second is a methanogenic stage. The biomass achieves maximum performance compared with solitary storage tank AD, as well as optimisation of pH levels, temperature level and home times is achieved automatically.

The plant has reduced emissions. The ArrowBio design needs no costly gas rubbing stage, and also the greatly water birthed strategy does not create the troublesome (dirt, smell, etc) emissions experienced from some other procedures.

Recognition of the sustainability benefits of Anaerobic Digestion in launching power from our garbage is rising quick.

Learn even more concerning this modern technology for the future, at the Anaerobic Food digestion Area web site, and also much more about the ArrowBio AD Refine as well.

How to create your perfect kitchen

Whether you’re updating your existing kitchen or adding an extension, there are 10 key steps you will need to follow. Proper planning and preparation will help make sure you the final outcome fulfils your needs. A good kitchen companies Sydney will provide you with a kitchen designer.

Always use the skills of an architect, architectural technician or kitchen designer – they have a wealth of design knowledge and know how to create a room that works perfectly with the rest of your house.

1. Understand the space you have

Before you start choosing units and tiles, you need to understand the space you’re working with. Ask a kitchen company, an architect or architectural technologist for scale drawings. This will enable you to see exactly how much room you have to work with, and you can start planning how to make the most of it.

Think about the location of internal and external doors and windows, so you have the best flow possible between your kitchen, outside space and the rest of your house. Have a clear idea of how much you want to spend before contacting a designer, as this will ensure you end up with a scheme you can afford.

2. Consider the best layout

You need to design the kitchen layout to fit your lifestyle. If you want an open-plan kitchen-living-diner, think about where each zone will work best. It usually makes sense to have the kitchen in the darkest part of the space, with the dining and living areas – where you will spend more time relaxing – closest to windows overlooking the garden.

There’s a growing trend for ‘broken-plan’ living, where the spaces are only partly separated –you may want to include a half wall between the kitchen and living space, or a pocket sliding door that allows you to divide off the dining room for more formal entertaining.

Breakfast bars or islands are a key component of most kitchens these days, so work with your designer to decide the best location for yours. You don’t want it to interrupt the flow of the room, and may want to integrate your sink or hob into the island to allow the chef to interact with people using the rest of the space.

You’ll also need to consider your glazing choices carefully, as this can make or break a design – do you want bi-fold or sliding doors? Would rooflights help bring natural light into the depths of the room? Now is the time to make these major decisions.

Here are some of the items you may want to include in your new kitchen:

  • Wall units
  • Base units
  • Glazed display units
  • Larder units
  • Island
  • Breakfast bar
  • Ovens
  • Hob
  • Sink
  • Tap or boiling water tap
  • Ceiling or downdraught extractor
  • Dining area
  • Living area
  • Underfloor heating
  • Pantry
  • Utility room
  • Rooflights
  • Bi-fold/sliding doors3

3. Decide on the style you want

Once you’ve decided on the best layout, you can start finalising the details. Do your research to find out exactly what style of kitchen suits your taste and lifestyle. For instance, if you have young children, smooth, wipe-clean units will be easier to keep clean than painted Shaker-style ones.

You’ll have to live with the design for years, so it’s worth spending time getting it right. Use homes magazines, architectural websites, kitchen company catalogues, design books and Pinterest to pull together a mood board of what you like. Allow yourself a few months to do this and you’ll soon see key themes emerging.

You’ll also need to finalise your budget at this stage to make sure you’re not looking at options out of your price range. Remember that just because you can’t afford high-end design choices like marble work surfaces, it doesn’t mean you can’t get the look with a cheaper alternative, such as a quality laminate. The huge range of kitchens on the market means, if you are willing to shop around, you can get a kitchen you love at a price you can afford.

Follow these tips to manage the cost of your new kitchen:

  • Remodelling costs less than extending, but as the kitchen is the most important room in the house for most people, it’s worth investing in the space to get it right
  • If your budget is tight, keep the design simple
  • A good-quality painted kitchen can be good value, as instead of replacing it, you can change the colour and look when you decide to redecorate
  • If you have to prioritise, invest in high-quality worktops and taps. High-fashion kitchens can look great, but may date quickly

4. Get the permission you need

If you’re planning to make internal structural changes to your kitchen, such as knocking down the wall between your kitchen and dining room, you won’t usually need planning permission, as this is covered by permitted development.

The majority of single-storey extensions are also covered by permitted development; however, certain exclusions and criteria apply, so always check with your local authority’s planning department before starting work.

Even if you don’t need planning permission, it may be worth applying to your local planning authority for a lawful development certificate, which proves that the work is lawful, and can be useful when you come to sell. If you are planning structural changes, make sure you use the services of an approved structural engineer.

Try our handy quiz, which will tell you instantly whether you’ll need planning permission for your kitchen extension.

5. Find the right team

Once you’ve had your plans drawn up and permissions granted, you’ll need to find tradespeople you trust to carry out any structural work and install your kitchen. This could include a builder, joiner, plumber, electrician and decorator.

For each of the different trades, you should get at least three detailed written quotes. Recommendations are always the best way to find people to work with, so ask friends and family before searching online.

Bear in mind that the cheapest quote may not be the best if it does not meet all your requirements, and you need to feel comfortable with the people you choose to work with.

Some kitchen companies offer a complete design, build and installation package, meaning you won’t need to find individual tradespeople, although this is often more expensive. If you choose this option, again always get quotes from at least three different kitchen companies. Even if you’ve fallen in love with a kitchen offered by one specific company, chances are others will offer something very similar.

6. Finalise the details

Once work starts, making changes can be costly. Agree on all of the final details, including the handles, appliances and other details, and stick to them.

It’s especially important to confirm the location of appliances, lighting and sockets, making sure sockets are in places that will be convenient, such as by the fridge and kettle. You should also consider where to put charging points and whether you’d like USB sockets.

And think carefully about extraction. Will you have a traditional overhead extractor, or could you install a downdraft model, which slots into your kitchen worktop and can pop up at the touch of a button?

When it comes to artificial lighting, make sure you include a combination of task, ambient and accent lighting. By finalising the details and ordering materials now, you’ll help the project run smoothly.

7. Start the building work

Now you have the team you want to work with and quotes agreed, it’s time for construction work to start. If you’re having walls demolished or an extension built, you may want to consider moving out while the work is complete. Alternatively, you could set up a makeshift kitchen – perhaps using your old cooker, sink and couple of units – in a different room. If you decide to stay, be prepared for dust, noise and disruption. If you decide to move out, make sure you visit the site regularly and are available to answer questions.

While knocking down internal walls and stripping out an old kitchen should take a few weeks, building an extension is likely to take three months or more. During this time, walls, floors and ceilings will be constructed, cables inserted for electrics and pipes for water.

8. Decorate the space

Once the walls plastered, you should be able to get a feel for how your new kitchen will look when it’s finished.

Now is the time to decorate the walls and ceiling. By painting before the units are installed, you’ll minimise the risk of drips and spills ruining your new kitchen. Opt for a wall colour that either complements or contrasts with your units. Although a plain white kitchen is timeless as it can easily be updated with accessories, consider going for a bolder wall colour, such as dark grey or petrol blue, for more of a style statement.

9. Install your new kitchen

Now it’s time for the most exciting part of the project – the installation of your new kitchen. Many kitchen companies offer an installation service for around £2,000, although most units can be fitted by a competent DIYer if you’re looking to cut costs. If you do choose this option, your extractor and cooker will need to be installed by an accredited electrician, and you may need a plumber to fit your sink and water-based appliances. Due to the cost of most worktops, it’s always best to ask a professional to fit these for you – mistakes can prove expensive.

10. Complete the tiling and flooring

You could tile, add a splashback to your walls or install your chosen flooring before fitting your units, but you’ll be paying for extra materials that won’t be seen once the kitchen is in place, so it makes sense to complete these tasks afterwards, instead.

Most competent DIYers will be able to tile or fit flooring themselves. Once the walls and floors are complete, it’s time to introduce the furniture, accessories and lighting, and start enjoying your brand-new kitchen.

Natural light

  • Introduce daylight from as many directions as possible — including rooflights and high-level or obscure glazed windows where privacy may be an issue.
  • Prioritise the best quality space – with the best daylight and nicest views – to the functions that are most important to you, usually living and dining.

For complete kitchen designs and costs, click here!

How to Design a Kitchen

How to design a kitchen? With the kitchen being such a high activity area of the house it’s worth finding out how to design a kitchen – even if you’re using a kitchen designer or architect. Knowing what’s involved in the process will help you design your own kitchen or give a detailed brief to your designer. Kitchen renovation cost depends on the design of your kitchen.

This page makes up part of the kitchen design layout series.

Step 1 – Pick Your Kitchen Cabinet Manufacturer

Now usually I’m always encouraging my site visitors to think in terms of how you want a space to function before making interior design or furniture choices but for kitchens it helps to know where you plan to get your kitchen cabinets from.

Most manufacturers have units in various standard sizes but always work with the kitchen cabinet dimensions that the manufacturer provides.

Even if you’re getting a bespoke kitchen made, getting in touch with a maker and finding out if they work in any standard sizes (eg using whole pieces of wood to avoid cutting which reduces waste, need less labor and therefore cost a bit less).

Step 2 – Create a Floor and Wall Plan

The second step of how to design a kitchen is to create a plan of your kitchen ‘space’ – the floor space and the wall space.

First decide if you’re working in feet and inches or m, cm and mm. For example in the United States and Canada kitchens are designed and sold in inches, in the UK and Australia it’s millimetres. Take the lead from the main measurement that your cabinet manufacturer uses.

Time to measure up! Take your time and be accurate and measure using the right measurement for your country. Measure floor dimensions, niches, windows, doors, where the water pipes (and gas supply if applicable) come up from the floor.

Now it’s time to draw up the plan.

You can do this on paper by following the instructions on draw floor plans but just for your kitchen rather than the whole house. Or you can use one of the online kitchen planners or software available (a bit more about that at the bottom of this page).

If you stick to the paper option, it’s a good idea to adjust the scale so that you fit the kitchen onto a sheet of paper rather than the whole house. The scale you can use depends on how big your kitchen is and how big your paper is.

Step 3 – Plan the Outline of Your Kitchen

It might be really obvious what shape your kitchen is going to be. If so, go ahead and have a look at the relevant page below. If not you can take a look at these for inspiration

Also take a look at the kitchen dimensions page that goes through some important kitchen planning guidelines.

Using your paper drawing, online kitchen planner or software plan in the outline of where you will place the base cabinets, wall cabinets, islands and tables in your kitchen in plan view (looking down from above). Don’t worry about where the appliances and fixtures will be placed just yet.

Other Considerations on Kitchen Shape

As well as the shapes above you could also consider incorporating curves in to the kitchen. This introduces challenges of being able to open adjacent cupboards and drawers at the same time without the doors or drawers banging into each other – but leaving a bit of space in between each set of units mitigates this.

If you have a bigger room to work with one of the main things to decide is whether the kitchen will occupy the whole room with an eating area open to the kitchen, or whether you want to try and maintain a bit of privacy to the cooking area – make it a bit like a bar or a coffee shop counter. If you have an accident with dinner you might want to be able to put it right without everyone looking at you!

Step 4 – Place the Appliances and Fixtures

Head on over to the kitchen triangle page.

Then come back here and draw in the the appliances and fixtures onto your plan

Step 5 – Plan Detailed Storage

Head on over to the kitchen storage ideas and kitchen storage solutions pages. Storage is a big part of how to design a kitchen.

You’re back? Phew – that’s kitchen storage done. At this stage you should have the wall plans filled out with all the fixtures you’re planning.

Step 6 – Lighting

At some stage I’ll be writing up a page on kitchen lighting design.

Your cabinet manufacturer may have some integrated lighting options.

Step 7 – Electrical

Plan the electrical points (outlets and switches for appliances) for your kitchen.

There are several options for general outlets.

If you have an appliance garage, a cupboard mounted microwave or want a TV in your kitchen think carefully about the best position for outlets.

Step 8 – Plan for other activities in the kitchen and surrounding spaces

What other activities will happen in your kitchen apart from those related to food? How about a sitting area with a TV or games console? Office type activities such as computer time and paying the bills are also popular in kitchen spaces.

Have a think about how your kitchen will relate to the spaces surrounding it. If it’s open plan to a dining space or living space what kind of view does the people in these areas get of the kitchen?

How to design a kitchen? Click here on how to design your main living space.

Master Electrician Education and Training Requirements

Master electricians require some formal education and extensive hands-on training. Learn about the education, job duties and licensure requirements to see if this is the right career for you. There are services that emergency 24 hour electricians Melbourne that are not available on others.

They’re not called ‘master’ electricians for nothing: achieving this rank involves years of work experience and continuing education. You can begin on-the-job training without formal education in some states, while others do require a degree or certificate. No matter where you start, you’ll need to work for several years before you can become licensed as a master electrician.

Essential Information

Master electricians are often in charge of the installation and maintenance of electrical systems in homes, businesses and institutions. Most states license master electricians based on examinations, accrued experience and on-the-job training as a journeyman or apprentice electrician; some states lower the required years of experience for master electrician candidates who have vocational school training, an associate’s degree or a bachelor’s degree in electrical engineering.

Educational Requirements for Master Electricians

Colleges and vocational schools offer certificate, degree and continuing education programs for those seeking a career as a master electrician. Maine mandates a 576-hour vocational training program for electricians, while postsecondary education is optional in other jurisdictions. Some states accept a trade school diploma, associate’s degree or engineering bachelor’s degree in lieu of some of the required practical experience. Most states require electricians to pass the same licensure exam, regardless of their educational background.

Classroom study in an electrical engineering bachelor’s degree program usually consists of applied mathematics, fundamentals of electricity, project management and architectural wiring. Vocational programs cover the National Electrical Code, cabling, OSHA regulations and local building codes.

Most master electricians take continuing education classes throughout their careers to keep their skills up-to-date and maintain licensure. Courses are typically offered by state-approved schools or vocational programs and may be held either online or on-campus.

Training Requirements

Training requirements for master electricians vary according to state and union regulations. In most areas, training begins in an approved apprenticeship program following graduation from a degree program. Some apprenticeship programs specialize in residential, commercial or new construction, while others may cover various general contracting jobs.

Apprenticeship programs usually run 3-7 years and typically divide hours between classroom and on-the-job training. Classroom study can include applied circuitry, electronic drafting, digital electronics and electrical instrumentation. Outside training is done under the supervision of a master electrician or journeyman at job sites and projects.

Following completion of an apprenticeship program, most states require that electricians spend time as journeymen before moving up to become master electricians. After earning a state journeyman license, electricians usually spend at least two years acquiring work hours before they can apply for a master electrician license.

Education options vary for those who wish to become master electricians, so often you can combine classroom learning and on-the-job training in a way that works best for you. Apprenticeships overseen by senior members of the profession are a common way to build up the years of experience needed to meet licensing requirements for journeyman and master electricians.

Save Time & Money Doing Your Own Basic Electric Wiring

Hiring a professional electrician Melbourne CBD can be very expensive and is often the reason why people try doing their own basic electric wiring themselves.

I have seen the good, the bad and the ugly results of these efforts and I have come to the conclusion that basic electrical wiring is not something anyone should do without proper guidance, tools and confidence.

It is so important that before attempting any of these basic electrical wiring projects that people are aware of how dangerous electricity is and how important safety is for you and for your family and family home.

90 percent of the time I recommend hiring a licensed electrician over doing your basic electrical wiring yourself. Not doing this will usually end up costing even more money than before and increase the risk of bringing your family into danger without even knowing your doing it.

But doing your own basic electric wiring really isn’t that hard to do if you “educate” yourself on the topic.

Licensed electricians had to learn the stuff themselves too. So as a ‘do it yourself person’ this isn’t different. There is no escape possible.

You will see that the more you read about it the easier it will become and the more confidence you will get.

Just to give you an idea, here are 3 questions I recently got from people just like you who tried doing their own electric wiring:

Question 1: I installed a grounding probe in your aquarium and every time anyone in the house turns on or off the lights, the fish jump. What’s going on?

A couple of suggestions:

1. (easiest) Pull out that grounding probe and return it from whence you purchased it.

2. Check the wiring on your outlet. You may actually have ‘Neutral’ instead of ‘Ground’.

3. Check the wiring throughout the rest of the house. There are some people out there that insist on doing their own home repairs, yet don’t understand basic electrical wiring.

Outlets are easy to check by getting a $7.95 outlet tester from the hardware store. Wired-in appliances, lights, heaters, etc. are tougher.

4. Check all your electrical fixtures to make sure they aren’t leaking some voltage to Ground.

Question 2: What is the NEC? Where can I get a copy?

The NEC is a model electrical code devised and published by the National Fire Protection Association, an insurance industry group. It’s revised every three years.

The 1993 version has been released. You can buy a copy at a decent bookstore, or by calling them directly at 800-344-3555.

The code exists in several versions. There’s the full text, which is fairly incomprehensible. There’s an abridged edition, which has only the sections likely to apply to most houses.

And there’s the NEC Handbook, which contains the “authorized commentary” on the code, as well as the full text. That’s the recommended version. Unfortunately, there’s no handbook for the abridged edition. And the full handbook is expensive — US$65 plus shipping and handling.

Question 3: Can I do my own wiring? Extra pointers?

In most places, homeowners are allowed to do their own wiring. In some, they’re not. Check with your local electrical inspector. Most places won’t permit you to do wiring on other’s homes for money without a license. Nor are you permitted to do wiring in “commercial” buildings.

Multiple dwellings (eg: duplexes)are usually considered “semi-commercial” or “commercial”. However, many jurisdictions will permit you to work on semi-commercial wiring if you’re supervised by a licensed electrician – if you can find one willing to supervise.

If you do your own wiring, an important point:

Do it NEAT and WELL! What you really want to aim for is a better job than an electrician will do. After all, it’s your own home, and it’s you or your family that might get killed if you make a mistake.

An electrician has time pressures, has the skills and knows the tricks of the trade to do a fast, safe job. In this FAQ we’ve consciously given a few recommendations that are in excess of code, because we feel that it’s reasonable, and will impress the inspector.

The inspector will know that you’re an amateur. You have to earn his trust. The best way of doing this is to spend your time doing as neat a job as possible. Don’t cut corners. Exceed specifications. Otherwise, the inspector may get extremely picky and fault you on the slightest transgressions.

Don’t try to hide anything from the inspector.

Use the proper tools. Ie: don’t use a bread knife to strip wires, or twist wires with your fingers. The inspector won’t like it, and the results won’t be that safe. And it takes longer. And you’re more likely to stick a hunk of 12ga wire through your hand that way.

Don’t handle house wire when it’s very cold (eg: below -10C or 16F). Thermoplastic house wire, particularly older types become very brittle.

As you can see, getting the right answers to your questions can make the work a lot easier.

You save time by doing it “the right way” from the first time and you save money because you won’t need to hire an electrician to either do the entire job or to fix your screw-ups.

In any case, no matter what you, be very careful when working on electricity! If needed cut down the entire power of your house just to be sure.

Keep It Safe,

——————————————————–

Nico De Baere is a licensed electrician with over 10 years of experience with home and industrial electric wiring. He is the author of the ebook Basic Electric Wiring which gives answers to 77 of the most ask questions on basic electric wiring. Visit his site now or click here [http://www.basicelectricwiring.com]

—————————————————-

Article Source: http://EzineArticles.com/expert/Nico_De_Baere/8187

Article Source: http://EzineArticles.com/40054

5 Steps to Become a Licensed Master Electrician in the USA

Electricians are responsible for installing new electrical infrastructure, while keeping the wiring and equipment in existing buildings and power grids in top condition. Since modern society depends on electricity to operate, the electrical profession can be very rewarding. According to the US Department of Labor, the average annual wage for electricians in 2016 exceeded $56,000, and in specialized sectors such as oil and gas it is even possible to make a six-figure income. Emergencymelbourneelectrician.com.au is a company with years of experience providing high-quality 24 hr electricians Melbourne, wiring and cabling for Melbourne homes and businesses alike.

This article will provide an overview of the process required to obtain a master electrician license in the USA. Keep in mind this is a general overview, and there are specific requirements that vary by state.
Step 01 – Meet the Minimum Requirements to Receive Training

The electrical profession requires ample training to learn about its technical aspects and construction practices, while gaining awareness of the risks it involves. However, the following requirements must be met before embarking on the learning process:

  • A minimum age of 18.
  • Obtaining a high-school diploma.
  • Passing an aptitude test.
  • Passing a substance abuse test.

Step 02 – Receive Training as an Electrician Apprentice

If you meet the minimum requirements you can start receiving training to become an electrician, and generally there are two paths available, which take from 4 to 5 years.

Apprenticeship programs are normally managed by electrician trade unions or the government, and you are trained in the electrical trade by working under the supervision of licensed electricians. This is a “learning by doing” approach with relatively little classroom learning, where you start with basic tasks and are given more responsibility as you acquire knowledge and experience.

Trade schools provide an approach with a higher focus on classroom learning, where you are then required to work for a minimum number of hours that is specified by state.

Of course, a mixed approach is also possible: many electricians start in trade schools and then complete the required work-hours in apprenticeship programs. Keep in mind that there are many sub-fields in the electrical trade; for example, working on residential installations is very different from working on transmission and distribution lines. If you would like to specialize in one area, it is recommended that you look for an apprenticeship with a company that works in that business sector.
Step 03 – Become a Journeyman Electrician

Regardless of whether you entered an apprenticeship or attended a trade school, you will eventually become eligible to take the journeyman electrician test. The requirement is completing an apprenticeship, or the combination of a trade school program and a work-hour quota. You become a Journeyman Electrician after passing the test.

After becoming a Journeyman Electrician, you can legally work in residential, commercial, industrial and utility settings, either as an independent technician or as a contractor’s employee.

Although Journeyman Electricians hold a license, there is a higher qualification available: the Master Electrician License. If you earn one, your professional field broadens and you can also expect a higher income.
Step 04 – Obtain Experience as a Journeyman Electrician

Becoming a Master Electrician just after becoming a Journeyman is not possible, since there are work experience requirements before being eligible for the test. However, Journeyman Electricians have much more options than apprentices with regards to their work, and their license gives them independence.

An Electrical Engineer may also be eligible for the Master Electrician test, depending on the type and amount of experience he or she has accumulated.
Step 05 – Obtain a Master Electrician License

Once you are a highly experienced Journeyman Electrician, you become eligible to take the Master Electrician test. Keep in mind, however, that there may be state-specific requirements to meet. Master Electricians can charge more for their services due to their experience and qualifications, and are also allowed to become contractors, starting their own company and hiring other electricians.